As part of the ‘Anti-Damage Reform’, the CIH aims to map all water networks and to enable construction without damaging the environment. The aim is to address these challenges whilst adhering to the design parameters.
The objective of the PMO’s mission is to:
- Draw up a new schedule with the appropriate level of detail.
- Propose an operational coordination approach.